How to Calculate Yarn Production in Spinning Mill

SHARE:

How to Calculate Yarn Production Per Shift of 8 Hours 

Introduction:  
Generally without overtime, production hour is 8 hour, From 9.00 am to 5.00pm. Within this period of time all types of regular scheduled production work happens. Production managers or Executive production merchandisers have to do exact calculation of expected production keeping in mind 8 work hour shift firstly. If the resulted quantity of production fails to ascertain the required quantity then they have to go for overtime. 


So that, this 8 hour shift of calculation is one of the most crucial calculation for any production industry. Let’s see how to calculate this for an yarn manufacturer’s (ring spinning).

Mathematical Problem and Solution: 


Problem: 01 
Find out the TPI of 20 Number of Yarn? 

Solution: 

Given, 
Yarn’s Number =20 
TPI=? 

We know, 

Twist per inch = TM x √ Yarn number or yarn count
= 4.5 x √ 20 
= 20.12 (ANS.) 

Problem: 02 
Find out the TPI ,If spindle speed is 9000 r.pm, Front roller speed=203r.p.m and length of the circumference 3.25 inch. 

Solution: 

Given that, 

Spindle speed = 9000r.pm 
Front roller speed = 203 
Length of the circumference 3.25 inch.  

Turns per inch = Spindle speed÷(Front roller length of the circumference x Front roller speed) 
= [9000 ÷ (203 x 3.25)] 
=13.64 inch.(ANS) 

Problem: 03 
If 36s warp is spun with 4.5 twist factor at a spindle speed of 10000 rpm. What is the production per shift of 8 hours per ring frame having 400 spindles (Efficiency 90%) ? 

Solution: 

Turns per inch = √ 36 x 4.5 =27.0 
Front roller delivery per minute = 1000 / 27 =370’’(Inch) 
Yard per minute on one spindle = [ (370 ÷ 36) x { (60 x 8) ÷ 840 } ] 
Hanks per spindle on per shift = [ (370 ÷ 36) x { (60 x 8) ÷ 840 } x (1 ÷ 36) ] 
Total ring frame production = [ (370 ÷ 36) x { (60x8) ÷ 840 } x (1 ÷36)x (400÷1) ] 

With 90% efficiency 

Actual production = [ (370 ÷ 36) x { (60x8) ÷ 840 } x (1 ÷36)x (400÷1) x (90÷100) ] 
= 58.8 lbs (pound) 

Entire Calculation at one step, 
= (10000÷27) x (1 ÷36) x { (60 x 8) ÷ 1 } x { 1 ÷ (840 x36) } x (400÷1) x (90÷100) ] 
= 58.8 lbs (pound) (ANS)

Problem: 04 
If 40s warp is spun with 4.5 twist factor at a spindle speed of 12000 rpm. What is the production per shift of 8 hours per ring frame having 500spindles (Efficiency 90%) ? 

Solution: 

Turns per inch= √ 40 x 4.5 =28.460 
Front roller delivery per minute = 12000/ 28.460 =421.65 ’’ (Inch) 
Yard per minute on one spindle = [ (421.65 ÷40) x { (60 x 8) ÷ 840 } ] 
Hanks per spindle on per shift = [ (421.65 ÷40 ) x { (60 x 8) ÷ 840 } x(1÷40) ] 
Total ring frame production= [ (421.65 ÷40 ) x { (60 x 8) ÷ 840 } x(1÷40)x (500÷1) ] 

With 90% efficiency 

Actual production = [ (421.65 ÷40 ) x { (60 x 8) ÷ 840 } x(1÷40)x (500÷1)x(90 ÷100)] 
= 67.765 

Entire Calculation at one step, 
= [ (12000÷28.460)× (1÷40)×(60 x 8) × { 1 ÷ (840x40) } × (500÷1)×(90 ÷100) ] 
= 67.765 lbs. (ANS)

COMMENTS

Name

About Textile,2,Calculation,82,Dyeing,9,Dyeing Calculation,9,Fabric Calculation,1,Fashion Merchandising,14,Fibers,2,Knitting,12,Knitting Calculation,12,Merchandising,14,Spinning,16,Spinning Calculation,16,Textile,2,Types Of Fiber,2,Uses Of Fiber,2,Weaving,16,Weaving Calculation,16,Yarn,1,Yarn Count,29,Yarn Count Calculation,29,
false
ltr
item
Textile Learning Platform: How to Calculate Yarn Production in Spinning Mill
How to Calculate Yarn Production in Spinning Mill
https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEiL4L1fPpo6mvYxm6qjZAq9CFMXBZ9U-iMnPLx_3JYAH12yAj8hI3d8KeMI5OtYi1dDIL2K-y12JPjQMEpWhRGfAqJsFNuF61O6kf9pyhLx4n6EsddZG5bv5qnWCh9l-hIOLHqN9Y8Baww/s1600/How+to+Calculate+Yarn+Production.jpg
https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEiL4L1fPpo6mvYxm6qjZAq9CFMXBZ9U-iMnPLx_3JYAH12yAj8hI3d8KeMI5OtYi1dDIL2K-y12JPjQMEpWhRGfAqJsFNuF61O6kf9pyhLx4n6EsddZG5bv5qnWCh9l-hIOLHqN9Y8Baww/s72-c/How+to+Calculate+Yarn+Production.jpg
Textile Learning Platform
https://textilelearningplatform.blogspot.com/2016/09/how-to-calculate-yarn-production-in.html
https://textilelearningplatform.blogspot.com/
http://textilelearningplatform.blogspot.com/
http://textilelearningplatform.blogspot.com/2016/09/how-to-calculate-yarn-production-in.html
true
1372763221854182214
UTF-8
Not found any posts VIEW ALL Readmore Reply Cancel reply Delete By Home PAGES POSTS View All RECOMMENDED FOR YOU LABEL ARCHIVE SEARCH ALL POSTS Not found any post match with your request Back Home Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sun Mon Tue Wed Thu Fri Sat January February March April May June July August September October November December Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec just now 1 minute ago $$1$$ minutes ago 1 hour ago $$1$$ hours ago Yesterday $$1$$ days ago $$1$$ weeks ago more than 5 weeks ago Followers Follow THIS CONTENT IS PREMIUM Please share to unlock Copy All Code Select All Code All codes were copied to your clipboard Can not copy the codes / texts, please press [CTRL]+[C] (or CMD+C with Mac) to copy